Construction
$62.0M
Frame $62.0M · JM $64.4M · ISO 3–6 $60.0M
Crescent Bend Housing Authority · MS194
962 units · $186.4M TIV · 12 locations
Statement of values
Upload, add, change or remove buildings for the whole portfolio or one conversion at a time. Each property carries COPE — construction, occupancy, protection and exposure. Auto stays on its own register.
You can edit the sample. Sign in to keep changes and write the history log.
COPE
Construction
$62.0M
Frame $62.0M · JM $64.4M · ISO 3–6 $60.0M
Occupancy
$144.3M
Family $144.3M · elderly $22.3M · scattered $13.9M
TIV mix
$186.4M
Building $163.2M · contents $12.2M · loss of rents $11.0M
Protection
$59.5M
Unsprinklered TIV · 8 buildings PPC 5+
Exposure
$49.9M
Zone AE TIV · convective wind / hail on the inland portfolio
42 properties · 962 units · $186.4M
Click a conversion above to edit just that slice of the SOV.
How count and tiv moved year by year — conversions, write-downs and replacements — before your live edits.
Quiet ACC portfolio. Eastview and Oakridge still on the master. Riverbend already a project program.
Eastview RAD close. Three buildings revalued after rehab — TIV up, count unchanged. Values leave the master for the project program.
Two scattered AE parcels scheduled that had sat in the blanket. TIV inflation on unconverted stock.
Oakridge residents relocated. Six former ACC buildings written down and removed ahead of demolition. Occupied units drop 180.
Four Oakridge pads added on builder's risk as construction starts. Master SOV is now unconverted ACC plus support.
Current portfolio. Oakridge fully on builder's risk. Two support-line corrections (annex, inland marine) added to the SOV.
Adds, updates, removals and uploads — seeded history plus anything you change.
Feb 3, 2026
Yard / inland marine
Contractors equipment scheduled separately from the shop.
Feb 3, 2026
Board / records annex
Annex split out of the administration building line.
Jun 20, 2025
Oakridge Building 4 + clubhouse
Fourth pad and clubhouse added to the conversion SOV.
Apr 2, 2025
Oakridge Building 3
Pad added as framing started.
Jan 8, 2025
Oakridge Building 2
Pad added on builder's risk.
Jan 8, 2025
Oakridge Building 1
Pad added on builder's risk. Permanent program not bound.
Jun 11, 2024
Oakridge Court (former ACC)
Six vacant ACC buildings written down and removed ahead of demolition. 180 units relocated.
Mar 12, 2023
Industrial Avenue house
Second AE parcel scheduled. Flood evidence still incomplete.
Mar 12, 2023
Valley Road duplex
AE parcel pulled out of the scattered blanket and scheduled separately.
Jul 18, 2022
Eastview Terrace
RAD close. Buildings A–C revalued after rehab, $19.2M → $28.4M. Moved off the master onto the project program.
Jul 1, 2021
CBHA master SOV
Annual SOV refresh on the master. 38 properties, $148.2M.